Installation of a New NGL Extraction Plant (4th Train) in San Joaquin Processing Capacity 1000 MMSCFD of NG.
Phase 1 : Extraction & transmission of Liquefied Natural Gas 63000 Barrel/Day via 16” 110 Km Pipeline.
Phase 2 : Ethane and Propane Mixture extraction and increase NGL production from 63,000 to 83,000 barrels/Day
|