  PROJECT DESCRIPTION
 

A lumpsum turnkey contract has been signed with Saudi Aramco for executing Yanbu Gas Plant Expansion Project.

The project aims to increase the overall production capacity at Yanbu Gas Plant (YGP) from 390 MBOD of C2+NGL to 585 MBOD. The current production facilities include two trains to produce Ethane, Propane, Butane, ISO-Pentane and Sales Gas.

A new additional De-Ethanizer system including the ancillary equipment shall be installed. The new train is de-signed to process 195 MBOD of C2+NGL to meet Aramco future requirements and future plans to feed downstream petrochemical projects at Yanbu and Rabegh.

Enppi scope of work for that project, which is scheduled to be completed within 28 months, includes basic engineering, detailed engineering, procurement, construction work, pre-commissioning, commissioning and start-up activities.