Projects

New Vacuum Distillation unit (SOPC)

New Vacuum Distillation unit (SOPC)

Suez Oil Processing Company (SOPC) 2014 – 2017 Main Contractor The project aims to install a new vacuum distillation unit for asphalt production by removing lighter fraction from long residue that is produced from the atmospheric distillation units processing Land, Marine Balayiem or equivalent crude oil. The new VDU for Asphalt production should be designed to produce 1,200 ton/day of…

Read more

New Preflash column system (MIDOR)

New Preflash column system (MIDOR)

Middle East Oil Refinery (MIDOR) 2014 – 2016 Main Contractor The project aims to install a New Pre-Flash Column to decrease the Vapor Load at Crude fired Heater in order to achieve design Unit throughput during processing Crude Oils with Higher API gravity and/or increase the CDU/VDU Unit-01 capacity to 115% in case of processing Crude Oil with same design…

Read more

New Vapor recovery (SOPC)

New Vapor recovery (SOPC)

Suez Oil Processing Company (SOPC) 2014 – 2017 Main Contractor The project aims to install a new vapor recovery unit instead of the demolished existing Unit to accommodate the off gases from various gas streams generated by processing units in addition to a new electrical substation and a new control room. The new VRU unit design capacity is 200,000 T/Y.

Read more

New Vapor recovery (ASORC)

New Vapor recovery (ASORC)

Assiut Oil Refining Company (ASORC) 2014 / 2016 Main Contractor The project aims to establish the New Vapor Recovery Unit with a feed capacity of 400,000 TON/Year to recover 97% of the butanes to produce 80,000 TON/year of on-spec LPG to serve upper Egypt LPG requirements.

Read more

Zohr Development Project – Phase I

Zohr Development Project – Phase I

Belayim Petroleum Company (Petrobel) 2015 / 2017 Main Contractor The project aims to establish the Onshore Plant Facilities of Zohr Development Project with a capacity of 2800 MMSSCFD on several phases. The first phase targets to reach production capacity of 1400 MMSCFD of gas at a pressure of 84 barg and condensates at a daily production rate of 3500 standard…

Read more