Al-Khafji Joint Operations (KJO)

2006 – 2012

EPC LSTK – Consortium (Enppi – Petrojet – PMS -Rawabi)

The project aims to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 kilometer subsea cables.