Yanbu Aramco Sinopec Refining (YASREF)

2013 – 2014

EPC LSTK

The project aims to supply YASREF crude oil tanks with Arab Heavy crude oil from YCOT existing plant through existing YCOT YR Pumps. The project starts at the common discharge U/G header of YCOT tanks T-1, 2 and 3 where a new interconnecting A/G pipeline will be connected to reach the Existing YR pumps. The YR pumps discharge will then be connected to a new metering skid before connecting to the interface point with SP2 inside YCOT fence.