Yanbu Aramco Sinopec Refining (YASREF)

2014 – 2017

Main Contractor

The Project includes two internal floating roof tanks with storage capacity of 300,000 barrels each, with diameter 68 m and height 16 m, 3 shipping pumps, metering and prover skid, in addition to piping works at the refinery facilities and offshore export berth, all the required modifications and tie-ins in the control system, electrical system , blending unit, telecommunication and loss prevention at the refinery to support the new facilities.

Facebook
LinkedIn