Middle East Oil Refinery (MIDOR)

2014 – 2016

Main Contractor

The project aims to install a New Pre-Flash Column to decrease the Vapor Load at Crude fired Heater in order to achieve design Unit throughput during processing Crude Oils with Higher API gravity and/or increase the CDU/VDU Unit-01 capacity to 115% in case of processing Crude Oil with same design API.

Facebook
LinkedIn