Suez Oil Processing Company (SOPC)

2014 – 2017

Main Contractor

The project aims to install a new vacuum distillation unit for asphalt production by removing lighter fraction from long residue that is produced from the atmospheric distillation units processing Land, Marine Balayiem or equivalent crude oil. The new VDU for Asphalt production should be designed to produce 1,200 ton/day of asphalt and vapor gas oil.

Facebook
LinkedIn