Belayim petroleum company – Petrobel

2017 – 2019

Lumpsum

The project consists of:

  • 24″ gas pipeline with length 31.00 Km starting from NIDOCO Well Head to Abu Madi field passing through stations NIDOCO 6, NIDOCO 11 and QARAA.
  • 32″ gas pipeline with length 92.00Km from Abu Madi field to ELGAMIL in Portsaid.
  • 26″ gas pipeline with length 27.00 Km starting from West Baltim offshore platform to Abu Madi field.
    In addition to some modifications in the piping work, valves and tie-in
    points to these stations.