The Egyptian Ethylene and Derivatives Company (ETHYDCO)

2015 – 2018

Lump sum for professional services and disbursable for Material supply

The project aims to generate electric power with a capacity of 70 MW per hour using Gas Turbines convertible to combined Cycle and connecting it to the Electrical National Grid to export the additional production and to have backup. (Phase 2)

Facebook
LinkedIn