Belayim Petroleum Company (Petrobel)

2016 / 2019

Main Contractor

The project aims to construct an offshore control platform with a weight of 2000 tons serving Zohr Field development Project; which will be installed 65 km from the coast and 160 km of the production facilities at a water depth of 85 meters.

Facebook
LinkedIn