Client:

SIDPEC

Location:

--

Date:

2019 - 2020

Project

Description

Perform Early Work of PDH&PP complex utility, which include:

  • Water intake system with design capacity of 2000 m3/hr
  • Raw water chlorination system
  • Raw water clarification system
  • Raw water filtration system
  • Cooling tower and cooling water systems
  • Cooling tower chemical injection system
  • Water desalination system
  • Water demineralization system

Contract Type
Lumpsum - Basic Engineering Early Works

Scope of Work
Basic Engineering Designs, Material Requisitions, Requesting Firm Quotations for Major Equipment and Requesting Budget Quotation for other pieces of Project Equipment to Determine the Project Cost Estimate and Schedule.

Related

Projects