Client:

ETHYDCO

Location:

Date:

2011 – 2015

Project

Description

The new Utility Plant includes the following:

  • Water Treatment System applying Zero Liquid Discharge (ZLD) concept with design capacity of 1100 m3/hr. includes (Ultra filtration, HERO, FEDI, crystallizer, evaporator, belt press, etc..)
  • Cooling water system
  • Chemical bulk storage and supply system (HCl & NaOH)
  • Potable /Utility water systems
  • Collection and discharge system for Treated wastewater from different plants

Contract Type
EPC main contractor, lump sum professional services, material supply & construction disbursable

Scope of Work
Detailed engineering, procurement services, construction supervision, pre-commissioning and commissioning supervision, & overall Management for the “PROJECT”, up to commissioning, start- up and performance tests