Replacing the old Hilal platform which was damaged due to a ship Collision by installing a 4 legged, nine-slot normally unmanned production platform at 80 m water depth.

GUPCO
Egypt
2010 - 2011
Share:
Project
Description
Contract Type
Lump-sum for professional services
Scope of Work
Front End Engineering Design (FEED) including engineering of the platform jacket, topsides and tie-ins to subsea pipelines, long lead requests for RFQs, project cost estimate and FEED technical package.



