Installation of a 6-slot 4-pile fixed offshore platform at 82m water depth in the Mediterranean Sea with one full deck producing 80 MMSCFD gas plus 4500 B/D condensate and installation of 3” glycol, 6” condensate, and 14” gas subsea pipelines connecting West Akhen.

GUPCO
Egypt
2001 – 2003
Share:
Project
Description
Contract Type
Lump-sum for professional services
Scope of Work
Detailed engineering, construction support engineering and installation analysis for the offshore platform structure (Jacket – with launching configuration – deck, piles and appurtenances) plus three subsea pipelines