Producing about 23,000 Ton per year (70 MTPD) which shall be used for Chemical purposes (Medicine, Cosmetics industries) and Industrial purposes (water Treatment process). The Plant consists of 9 major Areas: H2O2 Building Area / Utility Area / Product Dispatch Shed Area / Storage Tank Area / MCC Room / H2 Compressor Area / Chemical Storage Area / PA Compressor Area / Cooling Tower The Main equipment for the project are: Oxidizer / Hydrogenator / Extractor / Distillation Column which will be fabricated at Vendor premises at India and will be dispatched to site as segments and to be assembled at site by Const. contractor.

NCIC
--
2017 - 2019
Share:
Project
Description
Contract Type
Fixed Percentage of EP contract + Percentage of Construction Contractor (for Mechanical and Electrical work) contract
Scope of Work
Construction Supervision works for Mechanical works (equipment and Tanks Fabrication and erection, Piping Fabrication and erection, Steel Structure fabrication and erection) as well (Electrical work supervision)