Installation of a new production platform (six legged) at 35m water depth. The platform is equipped with process and utility facilities for 150 MMSCFD and connected to the existing platform through a 45m bridge.

WEPCO
Egypt
1990 – 1992
Share:
Project
Description
Contract Type
Lump-sum turnkey
Scope of Work
EPC turnkey, detailed engineering of topsides, structural modifications of existing platform, weight control, procurement services, load out of fully equipped deck, commissioning & start-up



