Design, supply and install a major transformer station in Upper Egypt at Assiut Oil Refineries complex with a design capacity of 3x75MVA and contractual power 125MVA, and it is scheduled to link the new station to another station as another source of energy in order to ensure the reliability of the source and the achievement of a system (Ring System).

ASORC
Egypt
2014 - 2019
Share:



