Installation of 2 platforms mwp-3 & mwp-4 at 34 & 37 m water depths
The project also inc unmanned luded:
- 8” production subsea pipeline
- 6” test subsea pipeline
- Two water injection subsea pipeline (8” & 4”)
- Two submarine electrical cables from mwp-4 to mwp-3