Client:

Saudi Aramco

Location:

--

Date:

2024 – 2028

Project

Description

Increasing the capacity of the water handling facilities at the CPF from 750 MBD to 1,100 MBD and treating the water from 100 ppm to less than 50 ppm of oil-in-water will enable the oil production to be maintained at MSC levels when the water rates are forecasted to exceed the existing system capacity.

Contract Type
EPC LSTK Main Contractor

Scope of Work
Detailed Engineering, Procurement, Construction, Pre-commissioning, and Commissioning & Startup Assistance.

Related

Projects