Installation of 2200 MMSCFD gas sweetening plant to completely remove the CO2 / H2S and CO2 dehydration for the natural gas upstream. The extraction facilities in ANACO and the dehydrated CO2 (200 MMSCFD) will be used for well gas lift, in addition to retrofit of the San Joaquin extraction facilities Trains A & B to achieve 98 % ethane recovery. The scope includes provision of molecular sieve dehydration package along with its regeneration (H2O plus CO2 200 MMSCFD – well gas lift.)

PDVSA
Egypt
2007 - 2013
Share:
Project
Description
Contract Type
Lump sum for professional services
Scope of Work
Basic & detailed engineering for sweetening package (ISBL), detailed engineering for C2 extraction unit (ISBL) and overall project management & coordination