Client:

PDVSA

Location:

Egypt

Date:

2007 - 2013

Project

Description

Development of new facilities to process the increase of NGL capacity to 50000 BPD to cover the requirements of the 1st phase of NGL production increase. Each fractionation train will be designed to produce propane, ISO-butane, n-butane, pentanes, gasoline, and heavy ends

Contract Type
Lump sum for professional services / material supply cost plus

Scope of Work
Conceptual design, basic & detailed engineering, procurement services and construction supervision

Related

Projects