Client:

GASCO

Location:

Egypt

Date:

2020 – 2025

Project

Description

Maximizing the production of commercial propane with the applicable increase in the C2/C3 product to meet the national petrochemical sector needs. GASCO intends to increase the complex capacity with an additional 600 MMSCFD gas feed. In line with this target, the project aims to add a new train (Train-D) with a design feed capacity of 600 MMSCFD with standalone utilities systems and consider tie-in provisions for further future expansion. The new facilities are designed to maximize the recovery of producing Commercial propane from the feed gas stream and to produce the following products:

  • Sales gas to national grid with high and low pressure
  • C2/C3 gas mixture
  • C3+ to existing Trains (A, B&C) De-Propanizer

The new feed will be handled by one train with max capacity of 600 MMSCFD. The train will comprise mainly of Dehydration section, chilling section, absorption section, compression section and fractionation section. Storage and off-site are not part of this project scope.

Contract Type
Consortium (Enppi/Petrojet)

Scope of Work
Basic & Detailed Engineering, Procurement Services Construction Supervision, Overall Project Management, Supervision for Commissioning, Start-Up & Performance Test

Related

Projects