Maximizing C2 & C3 recovery in the Western Desert Gas Complex and Ameriya Liquefied Petroleum Gas (LPG) plant. The recovered C2 & C3 in Ameriya LPG plant will be transferred to Western Desert Gas Complex through a 12-inch pipeline to be processed within Western Desert Gas Complex, where the storage and loading facilities exist.
The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day.
GASCO
Egypt
2005 - 2012
Share:
Project
Description
Contract Type
Lump-sum for professional services / material supply disbursable
Scope of Work
EPCM: Techno-Economic / Feasibility Study, Basic and Detailed Engineering, Procurement, Construction Supervision, Commissioning & Start Up Assistance & Overall Project Management.