Establishing a new Ammonia /Urea complex in Aswan with Ammonia production capacity of 1200 MT/day; 300 tons of the Ammonia produced will be utilized for industrial purposes by KIMA & 900 tons will be utilized in producing Urea.

KIMA
--
2011 - 2019
Share:
Project
Description
Contract Type
Fixed percentage from the project total EPC Lumpsum contract
Scope of Work
Project Management consultant (PMC) covering the review of the engineering design; follow up each of procurement, construction supervision & commissioning / start- up to ensure that EPC contractor fulfills all the contractual obligations. The EPC main contractor is Maire Tecnimont.