Client:

KIMA

Location:

--

Date:

2011 - 2019

Project

Description

Establishing a new Ammonia /Urea complex in Aswan with Ammonia production capacity of 1200 MT/day; 300 tons of the Ammonia produced will be utilized for industrial purposes by KIMA & 900 tons will be utilized in producing Urea.

Contract Type
Fixed percentage from the project total EPC Lumpsum contract

Scope of Work
Project Management consultant (PMC) covering the review of the engineering design; follow up each of procurement, construction supervision & commissioning / start- up to ensure that EPC contractor fulfills all the contractual obligations. The EPC main contractor is Maire Tecnimont.

Related

Projects