Client:

ETHYDCO

Location:

Egypt

Date:

2011 - 2015

Project

Description

Building a Polyethylene plant in Alexandria with a Total capacity of 400 KTA, Linear Low-Density Polyethylene (LLDPE) and High-Density Polyethylene (HDPE) Through two trains of a capacity 200 KTA each, using polymer grade ethylene as feed stock.
Licensor: UNIVATION TECHNOLOGIES LLC

Contract Type
EPC LSTK – Joint Venture Enppi / Toyo engineering Corporation

Scope of Work
Engineering, Procurement, Construction and Overall Management

Related

Projects