Developing of a single nine-slot platform with ESP, 10” subsea pipeline 22 km total length, and onshore receiving facilities at Gulf of Suez. Expected production rate 10,000 BOPD.
The offshore platform will be installed by using the Mobile Offshore Application Barge (MOAB) system (design concept by Overdick GMBH – Germany)




