Client:

Saudi Aramco

Location:

Saudi

Date:

2018 – 2021

Project

Description

Process and deliver 435 MBD of low sulfate water to injection headers in ANDR and FZRN reservoirs, using 580 MBD (maximum) sea water through 36-inch intake pipeline approx. 700 meters, 145 MBD of reject water will be returned to QUAD1 Pipeline through 16-inch intake pipeline approx. 700 meters. Low sulfate water will be required to maintain reservoir pressure. Nf package produces low sulfate water with capacity of 435 mbpd, Consisting of 5 trains 4 in operation and 1 common spare. The package design, delivered as modules with following parts:

  • Filtration skids. (6 skids)
  • Feed pumps skids. (5 skids)
  • Inlet control valves skids. (5 skids)
  • NF modules. (5 trains each train has 9 modules complete with the membrane vessels + 2 control valves skids)
  • CIP filtration skids.
  • CIP pumps.
  • SWRO for CIP water (two trains each have one membrane skid with its valves).

Contract Type
EPC LSTK- Main Contractor

Scope of Work
Engineering, Procurement, Construction, Pre-commissioning and Commissioning & Startup Assistance