Developing a grass root Phosphoric Plant to be constructed in Abu Tartour, Egypt. The Initial plans are to construct a 500,000 MTPY (P2 O5) Phosphoric Acid facility along with the associated sulfuric Acid Plant/Co-Generation system. The project is split into three main packages:
- Package 1: Site Establishment
- Package 2: Phosphoric Acid Production Plant to include Phosphoric Acid Plant, Co-Generation Plant, Sulfuric Acid Plant and all Utilities, Storage and MGA export line.
- Package 3: Insurance Coverage.