Belayim Petroleum Company (Petrobel)

2015 / 2017

Main Contractor

The project aims to establish the Onshore Plant Facilities of Zohr Development Project with a capacity of 2800 MMSSCFD on several phases. The first phase targets to reach production capacity of 1400 MMSCFD of gas at a pressure of 84 barg and condensates at a daily production rate of 3500 standard barrels (Phase I), in addition to high-quality sulfur with purity up to 99.9% as it is converted to solid shape for export with a daily production rate of 52 tons (Phase I).
The project will be implemented on several phases:-
Phase I:
Design capacity of 1400 MMSCFD of Gas (Feed Gas at 84 barg)
Phase II:
Increase the design capacity to 2800 of Gas (Feed Gas at 84 barg)