Long-distance (200 km long) subsea tie-back of new deepwater gas wells (20 in total) in about 1100-1600 m water depth to shore at the new Zohr onshore gas processing plant (Port Said - El-Gamil) via a new 30”/26”/14” subsea pipelines & 14” infield flowlines network, and associated PLEM’s/PLEM’s/HIPPS and Jumpers systems, in addition to SDU’s and Umbilicals systems and shallow water control platform.

Petrobel
Egypt
2016 - 2019
Share:
Project
Description
Scope of Work
Subcontract for Installation Engineering (lifting analysis, transportation analyses and sea-fastening design on installation barge) for PLET Structures, in addition to the Detailed Engineering of the subsea pipelines/flowlines Alignments Sheets (jointly with Saipem)



