Installation of a New Pre-Flash Column to decrease the Vapor Load at Crude fired Heater to achieve design Unit throughput during processing Crude Oils with Higher API gravity and/or increase the CDU/VDU Unit-01 capacity to 115% in case of processing Crude Oil with same design API.

MIDOR
Egypt
2014 - 2016
Share:
Project
Description
Contract Type
Lump Sum
Scope of Work
Basic and Detailed Engineering, Commissioning and Start-up Assistance