New Preflash Column System

Client:

MIDOR

Location:

Egypt

Date:

2014 - 2016

Project

Description

Installation of a New Pre-Flash Column to decrease the Vapor Load at Crude fired Heater to achieve design Unit throughput during processing Crude Oils with Higher API gravity and/or increase the CDU/VDU Unit-01 capacity to 115% in case of processing Crude Oil with same design API.

Contract Type
Lump Sum

Scope of Work
Basic and Detailed Engineering, Commissioning and Start-up Assistance