Developing the existing facilities to increase its capacity to reach 585 MMSCFD. An additional scope has been performed through an additional By-Pass line to connect PhPC plant to Petrobel Plant to secure the Gas production during PhPC plant Shutdown.

PhPC
Egypt
2010 - 2015 (Additional Scope 2017)
Share:
Project
Description
Contract Type
EPC LSTK (Enppi Main Contractor)
Scope of Work
Engineering, Material Supply, Construction, Commissioning and Start-up and Overall Management