Client:

Petrobel

Location:

Egypt

Date:

2008 – 2010

Project

Description

Developing Tuna field at the Mediterranean Sea by installing a new platform (4-legged platform approx. 82 m of water) and connecting pipelines (24’’ subsea pipeline approx. 15 km from Tuna platform to new PLEM and eventually to the existing Denise-A SSIV and 32” P/L to onshore plant near T-NW2 existing platform) to support the production of 4.5 MMSCFD.

Contract Type
EPC LSTK– Consortium of Enppi, Tecnomare and Petrojet (Enppi Leader)

Scope of Work
Detailed engineering, procurement services for subsea pipeline and material supply of topside facilities

Related

Projects