Installation of a new platform in water depth of 83.3m at PTB Seth gas field in the Ras El Barr Concession West Nile Delta area (Mediterranean Sea), total field production flow rate is 4.5 MMSCMD.

Petrobel
Egypt
2011 - 2012
Share:
Project
Description
Contract Type
EPC LSTK – Consortium of Enppi / Petrojet / Tecnomare (Enppi Leader)
Scope of Work
Detailed engineering for topside facilities, procurement services and material supply and assistance for commissioning and startup



