Development of new KARAM gas wells (Qty.6 wells) & rehabilitation of ASSIL gas wells (Qty. 6 wells) complete with new WHCP’s & Solar power system at each well. The produced gas delivered to the CO2 removal plant with new GTG rated 3.5 MW, 6.6KV connected in parallel with five existing GTG’s. A new Substation is erected with two distribution transformers 2MVA, 6.6KV SWG, 400V PMCC, EDG, MV/LV VSD’s & AC/DC UPS.

Bapetco
Egypt
2011 - 2016
Share:
Project
Description
Contract Type
EPC LSTK for Professional Services & Construction works and Disbursable Material
Scope of Work
Detailed Engineering, Procurement, Construction Works, Electrical and Instrumentation Installation Works, Pre-commissioning, Commissioning and Start-up Assistance including Pipelines and tie-in to the wells CO2 Removal Plant BED 3 tie-ins works and modifications