Badr Petroleum Company (Bapetco)

2011 – 2016

EPC LSTK for Professional Services & Construction works and Disbursable Material

Phase 1 of the project aims to produce 164 MMSCFD of gas from Karam gas field and 60 MMSCFD from Assil gas Field in the Alam El Shawish West Block Western Desert. The scope of work includes a carbon dioxide removal plant, Piping works and Modification to existing BED-3 Facilities.
Phase 2 aims to the Installation of Vapor Recovery Unit to reuse the exhausted vapors instead of venting it which will increase the efficiency of the plant and reduce the emissions and protect the environment