Phase 1 of the project aimed to produce 164 MMSCFD of gas from Karam gas field and 60 MMSCFD from Assil gas Field in the Alam El Shawish West Block Western Desert. The scope of work includes a carbon dioxide removal plant, Piping works and Modification to existing BED-3 Facilities. Phase 2 aimed to the Installation of Vapor Recovery Unit to reuse the exhausted vapors instead of venting it which will increase the efficiency of the plant and reduce the emissions and protect the environment

Bapetco
Egypt
2011 - 2016
Share:
Project
Description
Contract Type
EPC LSTK for Professional Services & Construction works and Disbursable Material
Scope of Work
Detailed Engineering, Procurement, Construction Works, Electrical and Instrumentation Installation Works, Pre-commissioning, Commissioning and Start-up Assistance including Pipelines and tie-in to the wells CO2 Removal Plant BED 3 tie-ins works and modifications